Mission-Critical Readiness | Any Clime and Place
Recovery Infrastructure Intake
MCR
Recovery Infrastructure
Project
Intake Brief
Pre-consultation intake — mcreadiness.com

Complete this brief before your consultation with the MCR team.

Five minutes. Six sections. Your answers let us arrive prepared — so your session focuses on decisions, not discovery.

01Vision
02Contact
03Facility
04Footprint
05Timeline
06Review
Step 01 of 06 — Recovery Vision
What Are You Building?

Select the recovery infrastructure that fits your mission. This shapes every question that follows.

Cold Plunge
Precision cold water immersion. Engineered for performance recovery, mental resilience, and physiological adaptation.
Combined Unit
Sauna and cold plunge in a single integrated system. The MCR flagship — contrast therapy at full capability.
MCR Flagship
🔥
Sauna
Heat therapy and recovery. Traditional Finnish, infrared, or steam — configured for your facility and user load.
📦
Deployable Container Unit
Full recovery infrastructure in a standard 20' or 40' shipping container. Field-ready. Mission-ready. Any Clime and Place.
Field Deployment
— Sauna Configuration Sauna Type
Traditional / Finnish
Wood-burning or electric. High heat, low humidity. The gold standard of heat therapy.
Infrared
Lower ambient temp, deeper tissue penetration. Popular for recovery and medical contexts.
Steam / Wet
High humidity environment. Ideal for respiratory benefit and spa-focused facilities.
Sauna Details
How many people will use the sauna simultaneously?
Primary interior wood species for the sauna bench and walls.
— Container Configuration Container Size
20' Standard
Compact and highly mobile. Fits a cold plunge, sauna, or combined unit with support systems.
40' Extended
Full recovery suite. Multiple stations, locker space, and expanded mechanical room.
Interior Configuration
Cold Plunge Only
Dedicated cold water immersion with full chiller and filtration system.
Sauna Only
Heat therapy with ventilation and bench configuration.
Combined Unit
Full contrast therapy — sauna and cold plunge in a single container.
Deployment Type
Permanent Installation
Set once, stays in place. Utility connections made on site.
Semi-Permanent
Relocatable but not frequently moved. Seasonal or multi-year deployments.
Fully Mobile
Regular relocation. Trailer-mounted or containerized for rapid deployment.
Field Conditions
Available power supply at the deployment site.
Primary operating environment for the unit.
How many container units are needed for this deployment?
Type of organization requesting the deployment.
Recovery Vision
Step 02 of 06 — Contact Information
Who We're Meeting With

A clean record attached to your project brief keeps everything organized and ensures the right person receives our follow-up.

Step 03 of 06 — Facility
Facility Type & Usage

The environment and daily user load shape every engineering decision — from chiller capacity to filtration cycle rate.

Facility Type
Military / Base Gym
Active-duty installation, base fitness facility, or SOCOM unit.
VA / Veteran Org
VA center, veteran-serving non-profit, or transition program.
Athletic / Performance
Commercial gym, sports team facility, or recovery clinic.
Spa / Wellness
Hotel, resort, day spa, or wellness center.
Private / Residential
Personal installation for home or private use.
Other / Mixed Use
Multi-purpose or unique environment.
Estimated Daily Users
1 – 10
Residential or small private group.
11 – 30
Boutique studio or small facility.
31 – 75
Mid-volume commercial facility.
75+
High-throughput or multi-unit deployment.
Step 04 of 06 — Space & Footprint
Space & Footprint

Rough dimensions are all we need at this stage. A formal site assessment follows before any specs are finalized.

Approximate floor length at the intended install location.
Approximate floor width at the intended install location.
Dedicated or shared space for chiller and filtration equipment.
Estimated distance from unit to mechanical room.
Installation Environment
Fully Indoor
Climate-controlled interior space.
Covered Outdoor
Covered patio, awning, or open-air structure.
Open Outdoor
Fully exposed — weatherized build required.
Step 05 of 06 — Timeline & Investment
Timeline & Investment

No commitment required — these ranges help us configure the right system tier and prioritize our proposal.

Target Timeline
Under 60 Days
Urgent — actively moving forward.
60 – 90 Days
Near-term, decisions being made now.
90 – 180 Days
Planning phase, building toward commitment.
180+ Days
Early exploration, no hard deadline yet.
Project Investment Range
$15K – $30K
Entry-level or residential-scale system.
$30K – $60K
Mid-tier commercial configuration.
$60K – $100K
Premium build with full options package.
$100K+
Multi-unit or flagship facility investment.
Constraints, existing infrastructure, partners involved, or project context.
Step 06 of 06 — Review & Submit
Review Your Brief

Confirm the details below. The MCR team will receive this brief and reach out within one business day to confirm your consultation.

Recovery Vision
Product Selection
Contact
Name
Organization
Role
Email
Phone
Facility & Footprint
Facility Type
Daily Users
Installation Area
Mechanical Room
Environment
Timeline & Investment
Timeline
Investment Range
Additional Notes

Ready to Submit

Your brief will be sent to projects@mcreadiness.com. The MCR team will confirm your consultation within one business day.

mcreadiness.com

Brief Received

Your project brief has been submitted to the MCR team. Expect a confirmation and calendar invite within one business day.

projects@mcreadiness.com